Carey Baptist Grammar School

A complex campus brief called for more than court cover. Greenline delivered a curved tensile membrane structure that balances sport, outdoor learning, daylight, durability and architectural fit.

CLIENT

Carey Baptist Grammar School

LOCATION

Kew, VIC

STRUCTURE

PVC Barrel Vault Structure

AREA COVERED

Multipurpose Sports

SIZE

2,350 sqm

FINISHES

Powdercoated Basalt Satin

MATERIALS

White Sky W9400+

  • Greenline-2026-Carey-Baptist-Grammar-School-Kew-37
  • Greenline-2026-Carey-Baptist-Grammar-School-Kew-24
  • Greenline-2026-Carey-Baptist-Grammar-School-Kew-31
  • Greenline-2026-Carey-Baptist-Grammar-School-Kew-27
  • Greenline-2026-Carey-Baptist-Grammar-School-Kew-28

    Brief

    Carey Baptist Grammar School identified a need for additional covered outdoor space at its Kew campus to support a growing program of learning, sport and extracurricular use. The existing multipurpose courts were an important part of daily campus life, but exposure to sun and weather limited how consistently the space could be used.

    The school needed a full-span cover that would protect the courts without creating a heavy or visually intrusive addition to the campus. Natural light, glare reduction, durability and minimal maintenance were all important considerations, with the structure required to sit comfortably beside existing buildings.

    The project also carried practical constraints. Greenline needed to manage planning and building approvals, protect the existing court surface, coordinate access and traffic management, and deliver the works within a tight school holiday window to avoid disruption during term.

    Solution

    Greenline worked with Carey Baptist Grammar School to develop a PVC barrel vault structure that balanced performance, durability and architectural fit. The curved white membrane softens sunlight and brings daylight into the courts, while the slim Basalt powdercoated steelwork provides a clean, contemporary frame.

    The tensile membrane solution was selected for its long-term durability, low maintenance requirements and lightweight visual impact. Its neutral tones and curved form were designed to complement the surrounding campus architecture rather than compete with it.

    Greenline managed the full process from design, approvals and procurement through to construction and installation. The works included surface protection, site access planning, traffic management and specialised sports lighting designed to comply with AS2560.2 Australian Standards for netball and basketball.

    Outcome

    The completed structure gives the campus a more flexible outdoor environment for learning, sport and recreation. Students can use the courts in more conditions, with improved comfort, reduced glare and protection from the elements.

    The covered space now supports a broader range of school activities, from everyday play and physical education to training and competition use. The integrated lighting further extends the versatility of the courts, helping the school get more value from the space across the year.

    Delivered during the Christmas holiday program, the project avoided term-time disruption while providing a long-term infrastructure investment for the campus.

    Michelle-Kafer

    “Greenline are an excellent company to deal with. They kept us informed of progress along the way and delivered exactly what we required.”

    Michelle Kafer
    CFO, Carey Baptist Grammar School

    Planning a covered court?

    Questions schools ask when creating more flexible space for sport, learning and gathering.

    How do you reduce glare under a covered school court?

    A translucent PVC tensile membrane can soften harsh sun while still allowing natural light into the space. For this project, the white membrane roof helped reduce glare and create a brighter, more comfortable environment for learning, sport and play.

    What lighting is needed for covered netball and basketball courts?

    Covered courts used for sport need lighting designed around the way the space will be used. This project included specialised sports lighting designed to meet AS2560.2 Australian standards for netball and basketball, supporting safe and consistent light levels for school sport.

    How can construction be managed around a busy school campus?

    Greenline managed design, approvals, procurement, access planning, surface protection, construction and installation through one coordinated process. The project was delivered during the Christmas holiday window, helping avoid term-time disruption for students, staff and daily campus operations.

     