John Paul College transformed ageing courts that were difficult to use in poor weather into a well-equipped facility for sport, learning and student gatherings. The upgrade has unlocked greater value from an existing part of the campus.
John Paul College
Frankston, Victoria
PVC Barrel Vault Structure
Multipurpose Sports
2,377 sqm
Powdercoated
Sky W9400+
John Paul College in Frankston supports more than 1,300 students from Years 7 to 12. Its outdoor basketball courts were an important part of daily school life, used before school, at recess and lunchtime, after school and during classes.
The courts had fallen into disrepair and were largely unavailable in poor weather. At the same time, the college was preparing to upgrade its gym and needed another reliable location where PE classes could continue while those works were underway.
The brief was therefore about more than weather protection. John Paul College wanted to improve an existing part of the campus and create a durable, multi-purpose facility for sport, learning and larger student activities. The project also had to be carefully coordinated around an active school environment, with construction planned to minimise disruption to students and staff.
After reviewing Greenline’s work at other schools, John Paul College appointed the team to deliver a covered facility over the existing court footprint. The structure combines a PVC cover and powder-coated steelwork with integrated lighting, audio, scoreboards, security cameras, Wi-Fi, in-ground plumbing and seating.
Together, these elements allow the space to support more than basketball, providing a well equipped setting for classes, competitions, gatherings and other school activities.
Construction sequencing was central to the delivery approach. Much of the structure was fabricated off site, with installation scheduled around the school holidays. Students left at the end of one year and returned at the beginning of the next to find the facility complete, allowing the onsite works to proceed without affecting normal school operations.
The completed courts are now used for PE classes, sports, inter-school competitions and student gatherings. Seating, audio and the wider suite of integrated services also make the facility suitable for larger groups and activities beyond sport.
By upgrading an underperforming outdoor area, John Paul College has gained a more useful and adaptable campus asset. The facility supports immediate teaching and recreation needs while giving the school scope to introduce new uses as students and staff become more familiar with the space.

John Visentin
Principal, John Paul College
Questions schools ask about transforming ageing outdoor courts into flexible, all-weather spaces for sport, learning and student gatherings.
A covered court allows an existing outdoor area to support more activities in more weather conditions. At John Paul College, ageing basketball courts were transformed into a dependable facility for PE classes, sport, inter-school competitions and student gatherings, unlocking greater value from an established part of the campus.
Early planning, off-site fabrication and installation during school holidays can significantly reduce disruption. At John Paul College, students left at the end of one school year and returned at the beginning of the next to find the facility complete, allowing the on-site works to proceed without affecting normal school operations.
Covered courts can incorporate much more than weather protection. John Paul College’s facility includes lighting, audio, scoreboards, security cameras, Wi-Fi, in-ground plumbing and seating. These integrated features allow the courts to support classes and competitions as well as larger gatherings and activities beyond sport.